top of page

Installation of purified water system, air system,piping and duct work needed for a pharmaceutical operation.

water system

purified water skid

water system

purified water skid and holding tank

water system

purified water delivery skid

air system

compressed air system for medical package machines

air system

compressed air system for medical package machines

duct work

duct work

Installation of fermenting tanks, chilled water lines and steams lines for a brewery.

piping

steam line piping

piping

steam lines and chilled water lines

piping

steam lines

piping

chilled water

tanks

fermenting tanks

tank

fermenting tank and mixing system

Removal and installation of a boiler system, piping, pumps and controls.

demo

cutting out and removing old boilers

demo

old boiler removal

demo

we had to cut the old boilers into pieces to remove them from the building

demo

one boiler gone, one more to remove

new boiler

wall mounted boiler

new boiler

the first wall mounted boiler in a series of three

pumps

installation of new system pumps and piping

boilers

three boilers running in series

boiler

finished product

bottom of page